[1] Jia Yuru,Fan Zhengqi. Rockburst mechanism and criterion in hydraulic cavity [C]∥Rock Mechanics Application in the Engineering. Beijing: Knowledge Press,1989.[贾愚如,范正绮.水工洞室中岩爆机制与判据[C]∥岩石力学在工程中的应用.北京:知识出版社,1989.]
[2] Xu Zeming,Huang Runqiu. Geological Hazard of Deep Buried,Long Extended Tunnel During Construction [M]. Chengdu: Southwest Jiaotong University Press,2000.[徐则明,黄润秋.深埋特长隧道及其施工地质灾害[M].成都:西南交通大学出版社,2000.]
[3] Hou Faliang. Criterion and prevention measurements measure for rockburst in circle tunnel [C]∥Rock Mechanics Application in the engineering. Beijing: Knowledge Press,1989.[侯发亮.圆形隧道中岩爆的判据及防治措施[C]∥岩石力学在工程中的应用[M].北京:知识出版社,1989.]
[4] Tan Yian. Application of fuzzy mathematics in rockburst prediction of underground [C]∥Symposium of the 2nd Academic Conference on Mechanics and Engineering in China. Beijing: Knowledge Press,1989.[谭以安.模糊数学综合评判在地下洞室岩爆预测中的应用[C]∥第二次全国岩石力学与工程学术会议论文集.北京:知识出版社,1989.]
[5] Shan Xiaoyun,Xu Dongqiang,et al. Prediction of possibility of rock outburst in workings with abrupt-change theory [J]. Survey of Mine,2000,12(4):36-37.[单哓云,徐东强,等.用突变理论预报巷道岩爆发生的可能性[J].矿山测量,2000,12(4):36-37.]
[6] Wang Lansheng,Li Tianbin,et al. The Problems of High geostress and Surrounding Rock Stability in Erlangshan Tunnel [M]. Beijing:Geology Press,2006.[王兰生,李天斌,等.二郎山隧道高地应力与围岩稳定问题[M].北京:地质出版社,2006.]
[7] Dowding C H,Andersson C A. Potential for rock bursting and slabbing in deep caverns [J]. Engineering Geology,1986,22:265-279.
[8] Zhang Zhiqiang,Guan Baoshu,Weng Hanmin. Basic analysis of conditions that cause rockburst [J]. Journal of Railway,1998,20(4):83-86.[张志强,关宝树,翁汉民.岩爆发生条件的基本分析[J].铁道学报,1998,20(4):83-86.]
[9] Xie Heping,Pari W G. The fractal characteristic and the mechanism of rockburst [J]. Journal of Rock Mechanics and Engineering,1993,12(1):28-37.[谢和平,Pari W G.岩爆的分形特征和机理[J].岩石力学与工程学报,1993,12(1):28-37.]
[10] Tang Lizhong,Wang Wenxing. A new tendency index for rockburst prediction [J]. Journal of Rock Mechanics and Engineering,2002:874-878.[唐礼忠,王文星.一种新的岩爆倾向性指标[J].岩石力学与工程学报,2002:874-878.]
[11] Wang Yuanhan,Li Wodong,Li Qiguang,et al. Comprehensive evaluation method of fuzzy mathematical for rockburst [J]. Journal of Rock Mechanics and Engineerin,1998,17(5):493-501.[王元汉,李卧东,李启光,等.岩爆预测的模糊数学综合评判方法[J].岩石力学与工程学报,1998,17(5):493-501.]
[12] Yang Jian,Wu Xiong. The comprehensive evaluation method for rockburst prediction [J]. Journal of Rock Mechanics and Engineering,2005,24(3):411-416.[杨健,武雄.岩爆综合预测评价方法[J].岩石力学与工程学报,2005,24(3):411-416.]
[13] Qin Naibing. The rockburst prediction by fuzzy mathematical method [J]. Engineering Mechanics,2001,2(suppl.):734-739.[秦乃兵.用模糊数学方法对岩爆进行预测预报[J].工程力学,2001,2(增刊):734-739.]
[14] Li Shulin,Feng Xiating. Tendency evaluation of rockburst in hard rock in deep well [J]. Journal of Northeast University,2001,22(1):60-63.[李庶林,冯夏庭.深井硬岩岩爆倾向性评价[J].东北大学学报,2001,22(1):60-63.]
[15] Cai Meifeng,Wang Jin'an,Wang Shuanghong. The energy analysis and rockburst comprehensive prediction in deep mined tunnel of Linglong Gold Mine [J]. Journal of Rock Mechanics and Engineering,2001,(1):38-42.[蔡美峰,王金安,王双红.玲珑金矿深部开采岩体能量分析与岩爆综合预测[J]. 岩石力学与工程学报,2001,(1):38-42.]
[16] Chen Haijun,Li Nenghui,Nie Dexin,et al. Artificial neural network model for rockburst [J]. Journal of Geotechnique Engineering,2002,24(2):229-232.[陈海军,郦能惠,聂德新,等.岩爆预测的人工神经网络模型[J].岩土工程学报,2002,24(2):229-232.]
|